How long does it take to build a first working prototype?
On Anvol's builds, a first working prototype of a custom electronic device took 3 to 15 days of development for simple devices, 10 to 30 days for small robots, and one to two months for large robots and underwater vehicles (as of November 2026). For a connected device with its own board, firmware and enclosure, our engineers' reference from design to delivery is about one month (a BLE and UWB tracking device) to about three months (a custom Bluetooth speaker). The clock starts when you sign the written scope; shipping comes on top.
By Zisheng Li, engineering lead, and Chris Wu, founder · Updated
From first message to a unit in your hands
- 1. First reply
- Within 12 hours, on WhatsApp or by email.
- 2. Quick feasibility check
- Free, in the first replies: the risks, what is missing and the next step. We sign an NDA before opening any file.
- 3. Written scope and date
- Deliverables, acceptance criteria, price and date, written once the open questions are answered. A deposit starts the work.
- 4. Development and first build
- 3 days to 2 months on our builds, listed below.
- 5. Your review
- You test the prototype and confirm it, or ask for the changes it needs; each change adds days.
- 6. Shipping
- Not in these times. Usually arranged by you once the units leave the factory.
How long a connected device takes, design to delivery
- BLE beacon and UWB tracking device
- About 1 month: device and wearable design, low-power board with charging, firmware with OTA, server software. Engineers' reference for similar builds.
- IMU motion-capture system
- About 1 month, design to delivery. Engineers' reference for similar builds.
- Custom Bluetooth speaker
- About 3 months, design to delivery. Engineers' reference for similar builds.
- Lidar line-following car
- About one month of development, then delivered as a small batch of tested cars under a client contract.
How long a first working prototype took, build by build
| Build | Kind | Development time |
|---|---|---|
| 24-channel logic analyzer | Instrument, reused open-source firmware | 3 days |
| LED pixel board | ESP32 board with a browser editor | About 10 days |
| AI voice companion | Battery voice device with a screen | About 10 days |
| Voice-controlled robot dog | Small four-legged robot | 10 days |
| Smart planter | Sensor device with a screen and voice | About 15 days |
| Desk AI companion | Bluetooth device with a screen | About 15 days |
| Robot-arm car kit | Small robot with a remote | 15 days |
| Tracked gel blaster robot | Small tracked robot | 15 days |
| ROS 2 omnidirectional robot | Mapping and navigation robot | 18 days |
| Six-legged robot | 18 servos and a phone app | 20 days |
| Wheel-legged balancing robot | Balancing robot | 20 days |
| Voice-controlled quadruped | Four-legged robot | 20 days |
| Small dynamic robot dog | Robot dog with its own programming tool | 30 days |
| Lidar line-following car | Robot car, delivered as a small batch | About 1 month |
| Indoor delivery robot | 200 kg cargo robot | 1 month |
| Large ROS inspection robot | Autonomous patrol robot | 1 month |
| Laser weeding robot | Remote-operated field robot | 1 month |
| Underwater ROV with arm | Underwater vehicle | 2 months |
From our project sheets. Development time, not a promise for your build: your written scope gives the date.
What adds time
- Before work starts
- The written scope comes once the open questions are answered, so the faster those answers come, the sooner the build starts. We reply within 12 hours.
- Scope changes
- A major change is re-quoted, with a new date, before work continues.
- Revisions
- Changes found on the first prototype are made with you before you confirm it, and each one adds days.
- Shipping
- Not in these times. Usually arranged by you once the units leave the factory.
- Certification
- FCC or CE testing is done by a test lab, on its own schedule, and quoted separately.
What makes it faster
- Reusing proven firmware or a development board. The logic analyzer took 3 days because its firmware was reused open source.
- A short brief that says what the first unit must do and what it can skip.
- One decision-maker who answers questions the same day.
How this compares
Questions
On our builds, 3 to 15 days of development for simple devices such as a logic analyzer, an LED board or a desk AI companion; 10 to 30 days for small robots; one to two months for large robots and underwater vehicles. Your written scope gives the date for your build.
When you confirm the written scope and pay the deposit. Before that, we reply within 12 hours and the quick feasibility check is free, so the faster the open questions are answered, the sooner the build starts.
Our engineers' reference for connected devices with their own board, firmware and enclosure is about one month (a BLE and UWB tracking device, an IMU motion-capture system) to about three months (a custom Bluetooth speaker). Shipping is on top.
Reusing proven firmware or a development board saves the most time: the logic analyzer took 3 days because its firmware was reused open source. A short brief and one person who answers questions the same day help too. For urgent projects, our $500 VIP Fast-Track gives a same-day team call and a same-day project brief and requirements document; projects can be completed in as little as 24 hours, subject to scope and feasibility.
Validation and the pilot batch are set per product in the written scope. The lidar line-following car took about one month of development and was delivered as a small batch. EVT, DVT and PVT with Anvol →
Late answers to open questions, scope changes (re-quoted with a new date before work continues), revisions found on the first unit, and certification: FCC or CE testing runs on the test lab's schedule and is quoted separately.
Sources
- LA New Product Development Team, how much does a prototype cost to make, updated 2026-09-02
- JLCPCB, PCB prototype assembly, accessed 2026-10-19
Next: the seven steps and when you pay → · what $1,500 to $4,000 builds → · what a prototype costs →