Anvol runs prototype, EVT, DVT and pilot builds under one US contract, with you approving each stage before the next. Anvol can be that partner: one engineering lead runs your prototype, EVT, DVT and pilot (PVT) builds; our engineers in China design the boards and firmware, buy every part and manage production on partner lines in China. You sign with Anvol, Inc. in USD, approve each stage, and get the files and test reports at every step.
By Zisheng Li, engineering lead, and Chris Wu, founder · Updated
Who this is for
A startup that already has a prototype or a design, and needs one partner to carry it through engineering validation, design validation and a pilot build, under one US contract.
- You will manage the factory yourself
- A named shortlist is a different offer. Factory names are not on our build pages. Your contract on this page is with Anvol, Inc. Factory shortlist →
- You need thousands of units and molds now
- We have not published a run of hundreds of units. A PVT at that size is quoted for its own quantity, not taken from the prototype prices.
- The lab test has to be inside the same fee
- Certification testing is done by a test lab and quoted separately. FCC for a prototype →
- You are still on a dev board
- EVT assumes a real design to test. Turning an ESP32 or RP2040 dev board into your own board and enclosure is the step before that. ESP32 dev board to custom PCB →
What each stage delivers with us
| Stage | What it proves | What Anvol does | You get | Typical time |
|---|---|---|---|---|
| Prototype | The idea works in real hardware | PCB, firmware, enclosure and sourcing, built into the first units | Design files and working prototypes you can test | Past builds took 3 days to 2 months of development; set in the written scope |
| EVT | The real design meets its key specs: power, heat, signals, firmware | Revisions and bench tests; on small devices usually inside the prototype stage | Written test checklist and report, on the units you can test | Inside the prototype time on small devices; otherwise set in the written scope |
| DVT | The near-final product passes reliability tests and the rules of its markets | Validation builds; molds are often made here; certification runs at a test lab, quoted separately | Validated design, written test results, validation units | Set in the written scope, per milestone |
| PVT | The line builds the same unit every time | First article on the partner line, fixtures, work instructions, a pilot batch | Pilot units you can test and a written batch record | Set in the written scope, per milestone |
| Production | Repeat batches of the approved version | Purchasing, assembly, inspection and packing on partner lines | Tested units and production files | Set per batch in the written scope |
How you stay in control
- Written scope per stage
- Deliverables, acceptance criteria and price before each stage starts; milestone payments.
- Your approvals
- The prototype, the design before any larger run, every part substitution, and each batch.
- One contact
- One Anvol engineering lead from the first file to the packed batch.
- Your files
- Schematics, PCB files, firmware source, enclosure CAD and BOM are delivered to you.
How a project runs
- You send what you have. We sign an NDA before any file is opened. The first reply is within 12 hours and is not a charge.
- The written scope for the next stage names deliverables, acceptance criteria and price before that stage starts. You sign with Anvol, Inc. and pay in USD. A deposit starts the work.
- Prototype work is the board, firmware, enclosure and sourcing, built into the first units. On our builds that development took 3 days to 2 months. Your date is the one in the scope, not a copy of those builds.
- You approve the prototype. On a small device, the engineering-validation tests usually sit inside that same prototype stage. They are not automatically a second invoice. Ask what the prototype already proved, and what work is left. Where the stage names sit in our seven steps →
- Design validation is the near-final product against reliability tests and the rules of the markets where it will be sold. Molds are often made here. The test lab, if you need FCC or CE, is still a separate quote.
- The pilot is a first article on the partner line, then the batch. A new line builds a first article before any batch. You approve the design before any larger run, every part substitution, and each batch. Every unit is tested before it is packed. From prototype to batch release →
What to send for a quote
- Which stage you think you are in, and what the prototype already does.
- Schematics, PCB files, BOM, firmware, CAD, photos, known bugs and test results, if you have them. A full specification is not required to start.
- The quantity for this run, the markets where it would be sold, and the target date.
What we have not shown yet
Our published builds include prototypes and small batches, including delivered lidar cars. We have not published a run of hundreds of units on this site; a PVT at that size is quoted for its own quantity. Simple products can combine stages: we cut repeated work, not the evidence the product needs.
We also have not published a standard number of weeks for DVT or for PVT. The table says those times are set in the written scope. Past prototype development on our builds is the only published range: 3 days to 2 months. A delivered small batch of lidar cars took about one month, development included, and that month is not a PVT duration for a different product.
Not included
- Certification testing (FCC/CE)
- Done by a test lab and quoted separately when a product needs it.
- Shipping and import duties
- Usually arranged by you once units leave the factory.
- Changes outside the written scope
- Re-quoted, with a new timeline, before work continues.
Questions
Not by the name alone. On small devices the engineering-validation tests are usually inside the prototype stage. A stage name is not a reason for a new fee. The written scope says what the prototype already proved and what work is left.
No. Our published builds include prototypes and small batches, including delivered lidar cars. A PVT at hundreds of units is quoted for its own quantity.
No. You sign with Anvol, Inc. and pay in USD. Production runs on partner lines. You see what each line does, not its name. Company facts →
Simple products can combine stages. We cut repeated work, not the evidence the product needs. What you still have to prove is written in the scope before that work starts.
Related: the seven steps → · testing and release → · pilot and small batch → · what each stage costs → · ESP32 dev board to custom PCB →