An EVT, DVT and PVT partner for startups building in China

Anvol runs prototype, EVT, DVT and pilot builds under one US contract, with you approving each stage before the next. Anvol can be that partner: one engineering lead runs your prototype, EVT, DVT and pilot (PVT) builds; our engineers in China design the boards and firmware, buy every part and manage production on partner lines in China. You sign with Anvol, Inc. in USD, approve each stage, and get the files and test reports at every step.

By Zisheng Li, engineering lead, and Chris Wu, founder · Updated

Who this is for

A startup that already has a prototype or a design, and needs one partner to carry it through engineering validation, design validation and a pilot build, under one US contract.

You will manage the factory yourself
A named shortlist is a different offer. Factory names are not on our build pages. Your contract on this page is with Anvol, Inc. Factory shortlist →
You need thousands of units and molds now
We have not published a run of hundreds of units. A PVT at that size is quoted for its own quantity, not taken from the prototype prices.
The lab test has to be inside the same fee
Certification testing is done by a test lab and quoted separately. FCC for a prototype →
You are still on a dev board
EVT assumes a real design to test. Turning an ESP32 or RP2040 dev board into your own board and enclosure is the step before that. ESP32 dev board to custom PCB →

What each stage delivers with us

StageWhat it provesWhat Anvol doesYou getTypical time
PrototypeThe idea works in real hardwarePCB, firmware, enclosure and sourcing, built into the first unitsDesign files and working prototypes you can testPast builds took 3 days to 2 months of development; set in the written scope
EVTThe real design meets its key specs: power, heat, signals, firmwareRevisions and bench tests; on small devices usually inside the prototype stageWritten test checklist and report, on the units you can testInside the prototype time on small devices; otherwise set in the written scope
DVTThe near-final product passes reliability tests and the rules of its marketsValidation builds; molds are often made here; certification runs at a test lab, quoted separatelyValidated design, written test results, validation unitsSet in the written scope, per milestone
PVTThe line builds the same unit every timeFirst article on the partner line, fixtures, work instructions, a pilot batchPilot units you can test and a written batch recordSet in the written scope, per milestone
ProductionRepeat batches of the approved versionPurchasing, assembly, inspection and packing on partner linesTested units and production filesSet per batch in the written scope

How you stay in control

Written scope per stage
Deliverables, acceptance criteria and price before each stage starts; milestone payments.
Your approvals
The prototype, the design before any larger run, every part substitution, and each batch.
One contact
One Anvol engineering lead from the first file to the packed batch.
Your files
Schematics, PCB files, firmware source, enclosure CAD and BOM are delivered to you.

How a project runs

  1. You send what you have. We sign an NDA before any file is opened. The first reply is within 12 hours and is not a charge.
  2. The written scope for the next stage names deliverables, acceptance criteria and price before that stage starts. You sign with Anvol, Inc. and pay in USD. A deposit starts the work.
  3. Prototype work is the board, firmware, enclosure and sourcing, built into the first units. On our builds that development took 3 days to 2 months. Your date is the one in the scope, not a copy of those builds.
  4. You approve the prototype. On a small device, the engineering-validation tests usually sit inside that same prototype stage. They are not automatically a second invoice. Ask what the prototype already proved, and what work is left. Where the stage names sit in our seven steps →
  5. Design validation is the near-final product against reliability tests and the rules of the markets where it will be sold. Molds are often made here. The test lab, if you need FCC or CE, is still a separate quote.
  6. The pilot is a first article on the partner line, then the batch. A new line builds a first article before any batch. You approve the design before any larger run, every part substitution, and each batch. Every unit is tested before it is packed. From prototype to batch release →

What to send for a quote

  • Which stage you think you are in, and what the prototype already does.
  • Schematics, PCB files, BOM, firmware, CAD, photos, known bugs and test results, if you have them. A full specification is not required to start.
  • The quantity for this run, the markets where it would be sold, and the target date.

What we have not shown yet

Our published builds include prototypes and small batches, including delivered lidar cars. We have not published a run of hundreds of units on this site; a PVT at that size is quoted for its own quantity. Simple products can combine stages: we cut repeated work, not the evidence the product needs.

We also have not published a standard number of weeks for DVT or for PVT. The table says those times are set in the written scope. Past prototype development on our builds is the only published range: 3 days to 2 months. A delivered small batch of lidar cars took about one month, development included, and that month is not a PVT duration for a different product.

Not included

Certification testing (FCC/CE)
Done by a test lab and quoted separately when a product needs it.
Shipping and import duties
Usually arranged by you once units leave the factory.
Changes outside the written scope
Re-quoted, with a new timeline, before work continues.

Questions

Not by the name alone. On small devices the engineering-validation tests are usually inside the prototype stage. A stage name is not a reason for a new fee. The written scope says what the prototype already proved and what work is left.

No. Our published builds include prototypes and small batches, including delivered lidar cars. A PVT at hundreds of units is quoted for its own quantity.

No. You sign with Anvol, Inc. and pay in USD. Production runs on partner lines. You see what each line does, not its name. Company facts →

Simple products can combine stages. We cut repeated work, not the evidence the product needs. What you still have to prove is written in the scope before that work starts.

Related: the seven steps → · testing and release → · pilot and small batch → · what each stage costs → · ESP32 dev board to custom PCB →

Send what you have, even if it is only a sketch.

Get a free project review

Or book a 30-minute call