From an approved prototype to a small batch.

Short answer: Anvol builds 10 to 100 units of a custom device, with every unit tested and the batch record included. Our delivered small batch of lidar cars took about one month. A handheld music device for a student team is in engineering.

By the Anvol engineering team · Updated

24-channel logic analyzer with coloured test hooksFour-wheel robot car with a lidar and a custom control boardWhite four-wheel robot outdoors at night on paving beside grass, four laser modules on a beam above it firing blue beams into the sky, green status lights

Batch reference figures

DeviceStatusUnitsPriceTimeIncluded
24-channel logic analyzerReference figures50$500 + ~$15 parts/unit3 days dev.Board, enclosure, test; open-source firmware

Reference figures from our engineers for a similar build, not a past invoice or a fixed quote. These figures exclude certification, shipping and import duties.

What changes with volume

Per-unit cost falls because the fixed board-assembly setup charge and printed or machined parts setup are spread over more units and parts get quantity prices; the development fee is paid once. Parts lead time and any design change affect cost and timing. How unit cost splits →

Not a fit if

You only need boards assembled
from finished Gerber and BOM files. A board-assembly service is cheaper and faster.
You need thousands of units
with molds and a production line now. That is a factory quote; we can prepare the design for it.
You need fulfillment
warehousing or per-order shipping. Not a standard service yet.

Who this is for

A validated design you need more units of: for a pilot with real users, a classroom, a demo fleet or first customers.

Typical starting points

  • Approved design files and BOM
  • A prototype we built with you
  • A previous batch you want repeated

What Anvol does

Prototype vs. batch
A prototype proves the design works. A batch repeats it: the same parts and process, and every unit tested against the targets from the sample rounds.
Hand assembly or PCBA
Chosen per project from board complexity and quantity, and written into the scope. Each machine board-assembly run pays a fixed setup charge, which is part of why small batches cost more per unit.
Fixtures
Whether the run needs assembly or test fixtures is agreed with you before the run.
Testing
Every unit is tested before it is packed.
Records
Each unit's test is recorded, and a batch record comes with every batch. Whether units carry serial numbers is agreed before the run.
Packing and delivery
How units are packed is agreed before the run; the batch leaves as a packed shipment. Fulfillment →
You confirm
The design, before any larger run. Fixtures, testing, records and packing, before the run. Any part substitution, before the part is used. Acceptance of each batch.

Deliverables

  • Tested units
  • Batch record
  • Packed shipment
  • Production files for your design

Typical inputs

  • Approved design files and BOM, or a prototype we built with you
  • Quantity
  • Target date
  • How units should be packed

Timeline and cost drivers

Timeline
About one month for our delivered small batch, development included. Part availability, quantity and test time set it, and the date goes in the written scope. Batch reference figures →
Cost depends on
Quantity, BOM, test time and packaging. The development fee is paid once, so a bigger batch spreads it thinner.
Quantity
No minimum order. Our reference examples run from 1 robot to 50 analyzers; we have also delivered a small batch of lidar cars; a larger batch is priced for its own quantity. Costs →

What is excluded

  • Shipping and import duties. Usually arranged by you once units leave the factory.
  • Certification testing (FCC/CE). It is done by a test lab and quoted separately when a product needs it.
  • Anything outside the written scope. Major scope changes are re-quoted, with a new timeline, before work continues.

Questions

No. We can start with a single prototype and continue into small-batch production after you approve it.

Yes, each for its own quantity. The about-1,000-set figures on our reference case pages are engineers' estimates. A real quote follows your BOM and test plan.

Fabrication and assembly run on partner lines, ordered and managed by Anvol. Your contract is with Anvol, Inc. Who is responsible for what →

Send what you have, even if it is only a sketch.

Get a free project review

Or book a 30-minute call