Where parts come from, and how units are checked.
How we source parts, test what we build and handle changes, and which part of the work is ours, our partner lines' or yours.
From prototype to batch release
- Requirements frozen in the written scope
- Design review
- First unit built and fitted
- Functional test
- Issues fixed and retested
- You approve
- Batch released
Sourcing
- Scope
- We buy every part, including older and hard-to-find chips.
- With your quote
- A full bill of materials, with a source for each part, costed from real parts and supplier quotes and checked by an engineer.
- Alternatives
- BOM cleanup includes approved alternative parts.
- Choosing a line
- Each job goes to a partner line that runs the process it needs (board type, layer count, assembly type), from the lines shown below. A new line builds a first article before any batch.
- Partner lines
- Production runs on partner lines. You see what each line does, not its name.
- Contract
- Your contract is with Anvol, Inc., not with a factory.
Testing
- Prototypes
- Power-on, function and communication tests, and structural checks.
- Incoming inspection
- Boards and materials are screened on the partner lines before assembly: bare-board AOI, 4-wire resistance test, microsection and RoHS screening (photos).
- Before a batch
- First-article inspection and design-for-manufacturing fixes.
- Before a run
- We agree with you on fixtures, how each unit is tested and recorded, and how units are packed.
- Every unit
- Tested before it is packed, against the targets from the sample rounds.
- Issues
- Logged, and the log stays open until every item is closed.
- Rework
- A unit that fails is reworked (the assembly line has a BGA rework station) and tested again before it is packed. Repeated failures go back to the design or the part choice, with your approval.
- You receive
- Test checklist, test report and test videos; a batch record with each batch.
Who is responsible for what
- Anvol
- Engineering, sourcing, testing and managing production, within the written scope. One Anvol engineering lead is your contact throughout.
- Partner lines
- Fabrication and assembly runs, ordered and managed by Anvol.
- You
- Confirm the written scope and price, approve the prototype and the design before any larger run, and accept each batch.
- Test labs
- Certification testing such as FCC or CE. Outside our standard scope; quoted separately when a product needs it.
- Shipping and customs
- Usually arranged by you once units leave the factory. Import duties are yours.
Change control
- At the start
- A written scope lists deliverables, acceptance criteria and price.
- Part substitutions
- Need your approval before the part is used.
- Scope changes
- Major changes are re-quoted, with a new timeline, before work continues.
IP and handover
- Ownership, NDA, files
- Who owns the design and what you receive →
The benches and lines behind it.
Electrical


Mechanical




Our engineering benches and partner lines. Unedited photos, not stock.
Inside the partner factories.
The board and assembly factories we order from, in their own photos. You see each process, not the factory's name. * Equipment-list image from the factory, not a photo of the line.
Manufacturing: PCB fabrication








Validation: board finishing, testing and screening








Manufacturing: SMT assembly and inspection








Manufacturing: through-hole, final assembly, burn-in and rework






Board types they make