A fractional manufacturing engineer for your hardware startup

Anvol, Inc. (Delaware) gives hardware startups a part-time manufacturing engineering team, with engineering and small batches in Beijing and Hangzhou and partner factories in Shenzhen and Suzhou, China, starting with a fixed-price review: $800 for one board, $1,500 for a full product with its enclosure, written findings in 7 days. The team covers BOM cost-down and alternate parts, DFM, a second quote from a partner line, first article and test. We took a lidar robot car from design to a delivered small batch in one month.

Updated

Step 1: a fixed-price review

BOM
Which parts drive the cost, which are at risk of shortage or end-of-life, and approved alternatives for each.
Manufacturability
Boards, enclosure process and assembly checked for the quantity you plan, and where the first batch would get stuck.
A second quote
A price from one of our partner lines for the same build, so you can compare with your current supplier.
What you get
A written list of findings and fixes, ranked by cost and risk, in 7 days. $800 for one board; $1,500 for a full product (boards, enclosure and assembly). Products with more than three boards are quoted within one business day of getting your files.

Taking over a KiCad design and firmware: what we need from you

Hardware files
The whole KiCad project folder, not exports: schematic, board, symbol and footprint libraries, 3D models, and the Gerbers and BOM from the last build you ordered, if any.
Firmware
The repository with its history, the toolchain and SDK versions it builds with, build steps, and how the board is flashed. If it only builds on one person's laptop, tell us.
Enclosure
CAD source and STEP files, plus the drawings or process notes for any molded or machined part.
Where it stands
Which boards you built, what failed, what you already changed by hand on a prototype and never put back in the files.
First step: audit the files
Before anything is ordered, we open the project on a clean machine and check that it rebuilds: the libraries resolve, the BOM matches the board, the Gerbers match the layout, and the firmware compiles and flashes. What does not rebuild goes on the findings list of the review above, ranked by cost and risk.

Step 2: monthly, if you want to keep going

Hours
A set number of engineering hours each month, agreed and priced after the review.
What the hours cover
Supplier follow-up, process choices, the first article built on the line and checked against your prototype, test fixtures, and the fixes it shows.
Reporting
A written update every week on what moved, what is blocked and what it costs.

Builds we have taken through it

BuildUnits and unit costDevelopmentDevelopment time
Six-legged robotParts $180 per set at 10 sets$5,00020 days
ROS 2 omnidirectional robotParts about $800 per unit at 50 sets$4,50018 days

Reference figures are our engineers' numbers for a similar build, not invoices or quotes.

Who does the work

Anvol, Inc. signs the contract. The work is done by our engineers in China, led by Zisheng, with engineers close to the partner lines that build the first article. We work with you over video calls and a shared document, in English.

Not included

Certification testing (FCC/CE)
Done by a test lab and quoted separately when a product needs it.
Defense and export-controlled work
We do not take ITAR, CUI or defense projects.
Changes outside the written scope
Re-quoted, with a new timeline, before work continues.

Related: DFM review for a robot → · EVT, DVT and PVT → · low-volume robotics runs →

Tell us where your first batch is stuck.

Book a 30-minute call

Or send your files for a review quote · chris@anvol.dev