A fractional manufacturing engineer for your hardware startup
Anvol, Inc. (Delaware) gives hardware startups a part-time manufacturing engineering team, with engineering and small batches in Beijing and Hangzhou and partner factories in Shenzhen and Suzhou, China, starting with a fixed-price review: $800 for one board, $1,500 for a full product with its enclosure, written findings in 7 days. The team covers BOM cost-down and alternate parts, DFM, a second quote from a partner line, first article and test. We took a lidar robot car from design to a delivered small batch in one month.
Updated
Step 1: a fixed-price review
- BOM
- Which parts drive the cost, which are at risk of shortage or end-of-life, and approved alternatives for each.
- Manufacturability
- Boards, enclosure process and assembly checked for the quantity you plan, and where the first batch would get stuck.
- A second quote
- A price from one of our partner lines for the same build, so you can compare with your current supplier.
- What you get
- A written list of findings and fixes, ranked by cost and risk, in 7 days. $800 for one board; $1,500 for a full product (boards, enclosure and assembly). Products with more than three boards are quoted within one business day of getting your files.
Taking over a KiCad design and firmware: what we need from you
- Hardware files
- The whole KiCad project folder, not exports: schematic, board, symbol and footprint libraries, 3D models, and the Gerbers and BOM from the last build you ordered, if any.
- Firmware
- The repository with its history, the toolchain and SDK versions it builds with, build steps, and how the board is flashed. If it only builds on one person's laptop, tell us.
- Enclosure
- CAD source and STEP files, plus the drawings or process notes for any molded or machined part.
- Where it stands
- Which boards you built, what failed, what you already changed by hand on a prototype and never put back in the files.
- First step: audit the files
- Before anything is ordered, we open the project on a clean machine and check that it rebuilds: the libraries resolve, the BOM matches the board, the Gerbers match the layout, and the firmware compiles and flashes. What does not rebuild goes on the findings list of the review above, ranked by cost and risk.
Step 2: monthly, if you want to keep going
- Hours
- A set number of engineering hours each month, agreed and priced after the review.
- What the hours cover
- Supplier follow-up, process choices, the first article built on the line and checked against your prototype, test fixtures, and the fixes it shows.
- Reporting
- A written update every week on what moved, what is blocked and what it costs.
Builds we have taken through it
| Build | Units and unit cost | Development | Development time |
|---|---|---|---|
| Six-legged robot | Parts $180 per set at 10 sets | $5,000 | 20 days |
| ROS 2 omnidirectional robot | Parts about $800 per unit at 50 sets | $4,500 | 18 days |
Reference figures are our engineers' numbers for a similar build, not invoices or quotes.
Who does the work
Anvol, Inc. signs the contract. The work is done by our engineers in China, led by Zisheng, with engineers close to the partner lines that build the first article. We work with you over video calls and a shared document, in English.
Not included
- Certification testing (FCC/CE)
- Done by a test lab and quoted separately when a product needs it.
- Defense and export-controlled work
- We do not take ITAR, CUI or defense projects.
- Changes outside the written scope
- Re-quoted, with a new timeline, before work continues.
Related: DFM review for a robot → · EVT, DVT and PVT → · low-volume robotics runs →